I agree...rock stabilization may not be an option in all cases.
And again, neither will stabilization need to be done in all areas.
and $1B for stabilization...is that prohibitive?
Perhaps budget for $250M/year for 4 years and do it in phases.
or $100M/year for 10 years and do it in 10 phases.
Planned correctly...a 10-year-plan would be reasonable.
Just look at the floodway...how much has that cost over the years? and how long has it taken?
And while it has reduced much of the problem...it hasn't solved the problem at the local river level.
And again, neither will stabilization need to be done in all areas.
and $1B for stabilization...is that prohibitive?
Perhaps budget for $250M/year for 4 years and do it in phases.
or $100M/year for 10 years and do it in 10 phases.
Planned correctly...a 10-year-plan would be reasonable.
Just look at the floodway...how much has that cost over the years? and how long has it taken?
And while it has reduced much of the problem...it hasn't solved the problem at the local river level.